SPMT and PMLS Animation by Engineered Rigging

  • 9 years ago
This project utilized both the PMLS and SPMT units to lift and install an RCP Motor in a Nuclear Power Plant. Note the fully loaded deck which secures the load above versus a suspended load below a hook. Contact eddy@EngineeredRigging.com or visit us at www.EngineeredRigging.com

Recommended