మాస్టర్‌ ప్లాన్‌ రోడ్ల నిర్మాణంలో అక్రమాలు

  • 3 months ago
Irregularities in Tirupati in Master Plan roads: ప్రజల భవిష్యత్తు అవసరాల ముసుగులో తిరుపతిలో నిర్మించిన బృహత్ ప్రణాళిక రహదారులు గత ప్రభుత్వ పెద్దల అక్రమాలకు సాక్ష్యాలుగా మిగిలాయి. రోడ్ల నిర్మాణంలో కనీస ప్రమాణాలు పాటించలేదు. మురుగు, వర్షపునీరు ప్రవహించే దారిలేక మాస్టర్‌ ప్లాన్‌ రోడ్లు మురికి కూపాలుగా మారాయి! రోడ్ల కోసం టీడీఆర్‌ బాండ్ల పేరుతో కోట్లు దిగమించిన వైఎస్సార్సీపీ నేతలు ప్రజాధనాన్ని దుర్వినియోగం చేశారు.

Category

🗞
News
Transcript
00:00In the construction of the roads of Tirupati Nagar Bruhathara Pranalika,
00:04fire and landslides have been seen one by one.
00:07Along with the commission's complaint,
00:09for the sake of political gain,
00:11the residents of the city are being forced to leave the city
00:14due to the obstructed construction of the roads.
00:16In the face of the future,
00:18roads have been built and crores of rupees have been spent.
00:20The land has been taken as a barrier
00:22and crores of rupees have been spent in the form of TDR bonds.
00:25At least the documents to construct the roads have been left in the air.
00:30Usually, the master plan roads are built in areas
00:33that have not been developed in the past.
00:35Along with the expansion of the population there,
00:37many areas are kept in view and constructed.
00:39Forty years of time is taken into account
00:41and the complete project details are prepared.
00:43In Tirupati, the master plan roads were built
00:45as per the request of the then local representative,
00:47Ayira Kumarudu.
00:49As a result, there is no rain water,
00:51and the roads are full of thorns.
00:53The holy Sibandhi is coming to drain the water.
01:24The construction of the master plan roads is in progress.
01:26The residents of the city are complaining
01:28that there is no need for people
01:30except for the construction of the roads
01:32and the construction of the roads.
01:34MLA Bhooman Karnak Reddy and his son Abinay Kumar Reddy
01:36have made a complaint about the master plan.
01:38As a part of that complaint,
01:40we are facing a lot of problems today.
01:42The people of the city are putting a lot of effort
01:44in the construction of the master plan roads.
01:46Look at the master plan roads.
01:48There are no sidetracks,
01:50there is no UDA system.
01:52The road construction has been done
01:54for the sake of the people of the city.
01:56There is no sidetracks anywhere.
01:58For the past 55 years,
02:00the road construction has been done
02:02without considering the UDA system.
02:04This is not helpful to anyone.
02:06It is not helpful to the contractors,
02:08to Karnak Reddy, to Abinay Kumar Reddy.
02:10It is not helpful to anyone.
02:12It is not helpful to anyone.
02:14It is not helpful to anyone.
02:16It is not helpful to anyone.
02:18It is not helpful to anyone.
02:20The road construction has been done well.
02:22The road construction has been done well.
02:24The road construction has been done well.
02:26The main area for the road construction
02:28is the drains.
02:30Without the drains,
02:32the road construction will be difficult.
02:34The road construction has been done well.
02:36The road construction has been done well.
02:38The road construction has been done well.
02:40The road construction has been done well.
02:42The road construction has been done well.
02:44The road construction has been done well.
02:46The road construction has been done well.
02:48The road construction has been done well.
02:50The road construction has been done well.

Recommended