This woman started with sanding down the window seals followed by dry patching the walls along with her partner. Later, the toilet got delivered followed by the bathtub. Therefore, the couple decided to work on the bathroom first. They removed the old plumbing and checked the leveling of the bathroom floor.
*The underlying music rights are not available for license. For use of the video with the track(s) contained therein, please contact the music publisher(s) or relevant rightsholder(s).
*The underlying music rights are not available for license. For use of the video with the track(s) contained therein, please contact the music publisher(s) or relevant rightsholder(s).
Category
🗞
NewsTranscript
00:00The baby's coming any day, but we've still been busting butt. By popular demand, we're keeping
00:04the arches and the trim work in this house. But as you can see, the window seals are disgusting.
00:08This one was actually covered in like a black tar, then a stain, and then back to the natural
00:13wood. So I sanded them down, but then I got distracted because I realized I could use my
00:16orbital sander on the patch drywall to take the rough edges off to make Trey's job easier.
00:21When we got back from lunch, we were greeted by a toilet. Our toilet has arrived, so I thought
00:26we'd focus on the bathroom, but Trey keeps doing more drywall. He had sanding and patching he
00:31wanted to get done. So I went outside because our piece of siding finally arrived, and I tied that
00:35in. And when I looked over my shoulder, the dude was cutting the grass. It really feels like there's
00:39no time left. And then I heard a beep, beep, beep out front, and look what's here, our bathtub.
00:44So now we really do need to focus on this bathroom because we're super excited to get it started
00:49before she gets here. We removed the old plumbing. We started to check out to see if this floor was
00:54level and how hard of a job this was going to be. And then we actually ran out of time.