• 2 hours ago
Plans may soon be underway to revive the Marcos Sr.-era Bicol River Basin Development Program (BRBDP) to help mitigate flooding in the Bicol region after President Marcos inspected Typhoon Kristine-hit areas there on Saturday, Oct. 26.

READ: https://mb.com.ph/2024/10/27/pbbm-eyes-revival-of-bicol-river-basin-dev-t

YOUTUBE:

Subscribe to the Manila Bulletin Online channel! - https://www.youtube.com/TheManilaBulletin

Visit our website at http://mb.com.ph
Facebook: https://www.facebook.com/manilabulletin
Twitter: https://www.twitter.com/manila_bulletin
Instagram: https://instagram.com/manilabulletin
Tiktok: https://www.tiktok.com/@manilabulletin

#ManilaBulletinOnline
#ManilaBulletin
#LatestNews

Category

🗞
News
Transcript
00:00These places, Batangas, Cavite, the water is gone.
00:06Here, the water doesn't go away.
00:08But that's the proverbial problem of the Bicol River Basin.
00:15That's why we really need to think about what are we going to do in the long term
00:21because you cannot expect any changes.
00:26The next time it rains, it will be the same situation all over again.
00:31So we have to find a long term solution.
00:33I was studying this and I found that in 1973,
00:40there was the Bicol River Basin Development Project.
00:46That's the only thing that wasn't completed.
00:49In 1986, when the government changed, the project was lost.
00:55So it was stopped.
00:57So we have to revisit it now.
01:00The conditions are different now.
01:02With the advent of climate change, now we have to focus specifically on flood control.
01:09The others, we have a lot of plans for the rest of it,
01:12but we have to focus now on flood control.
01:16But we cannot have this much water.
01:18We really cannot.
01:19Because there is no forecast like this.
01:24Climate change is all new.
01:27So we have to come up with new solutions.

Recommended